1. Mandatory harmonized field (CPR)
Construction products have 5 different systems of assessment and verification of constancy of performance. According to rules of Construction Products Regulation, the system 2+ is valid for most of them.
Declaration of the performance of the essential characteristics of the construction product by the manufacturer on the basis of the following items:
System 2+ | ||
The manufacturer shall cary out: | The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of conformity of the factory production control on the basis of the outcome of the following assessments and verifications carried out by that body: | Basis for CE marking |
|
|
|
In these cases the role of Igmat is to issue a Certificate of conformity of Factory Production Control after successfully carried out initial assessment. The Certificate validity is extended by regular continuous surveillance.
The other two systems, which Igmat performs, are system 1 and system 3.
For system 1 the tasks of manufacturer and the tasks of notified body are as follows:
System 1 | ||
The manufacturer shall cary out: | The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body: | Basis for CE marking |
|
|
|
The role of Igmat is to issue a Certificate of constancy of performance of the construction product after successfully carried out initial assessment. The Certificate validity is extended by regular continuous surveillance.
For system 3 the manufacturer and the notified body have the following roles:
System 3 | ||
The manufacturer shall cary out: | The notified testing laboratory shall: | Basis for CE marking |
|
|
|
The manufacturer shall draw up a declaration of performance in relation to the essential characteristics, when such a product is placed on the market.
Specific requirements for individual products are stated in harmonized European standards, which are, after publication in the Official Journal of the European Union, mandatory also in Slovenia.
Every manufacturer of construction products is obliged to introduce appropriate internal factory production control or authorize expert external laboratory and perform all the prescribed tasks.
Based on a written application for certification Igmat performs a necessary procedure of assessment and verification of constancy of preformance. When a construction product is covered by a harmonised standard or conforms to a European Technical Assessment which has been issued for it, the manufacturer shall draw up a declaration of performance when such a product is placed on the market and marks the product with the CE marking.
You are invited to turn to our certification department in order to establish initial contact and obtain detailed information about the procedure to obtain a certificate of constancy of performance.
2. National mandatory field (ZGPro-1)
In accordance with national law (ZGPro-1) Igmat performs certification also in national, non-harmonized field, for which it also obtained nomination from the sector Ministry of economic development and technology.
The systems, which Igmat performs in this field, are at the moment system 2+, 1+ and 1.
System 2+ | ||
The manufacturer shall cary out: | The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of conformity of the factory production control on the basis of the outcome of the following assessments and verifications carried out by that body: | |
|
|
In these cases the role of Igmat is to issue a Certificate of conformity of Factory Production Control after successfully carried out initial assessment. The Certificate validity is extended by regular continuous surveillance.
The manufacturer shall draw up a declaration of performance in relation to the essential characteristics of construction product.
System 1 | ||
The manufacturer shall cary out: | The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body: | |
|
|
System 1+ | ||
The manufacturer shall cary out: | The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body: | |
|
|
The role of Igmat is to issue a Certificate of constancy of performance of the construction product after successfully carried out initial assessment. The Certificate validity is extended by regular continuous surveillance. The manufacturer shall draw up a declaration of performance in relation to the essential characteristics, when such a product is placed on the market.
Product requirements are specified in normative documents such as regulations, standards and technical specificarions.
Every manufacturer of construction products is obliged to introduce appropriate internal factory production control or authorize expert external laboratory and perform all the prescribed tasks.
Based on a written application for certification Igmat performs a necessary procedure of assessment and verification of constancy of preformance.
You are invited to turn to our certification department in order to establish initial contact and obtain detailed information about the procedure to obtain a certificate of constancy of performance.
3. Voluntary field
In the voluntary field Igmat wish to enforce its own compliance mark. The producer decides to obtain this mark voluntarily.
Every producer can obtain this mark, after a conformity assessment procedure is successfully completed:
- in those areas which are not legally regulated (there are no harmonized or other standards), but there exsist technical specifications, which represent the latest state of the art and technology,
- if the manufacturer wish to establish a higher level of compliance evaluation than prescribed by the Regulation of Construction products or National legalisation (f.e. certification by system 2+ instead by system 4),
- if for internal commercial reasons believes that by obtaining an additional certificate client's trust in their product quality will be gained.
You can turn to our certification department in order to establish initial contact and obtain detailed information about the procedure to obtain a mark of compliance.